|
![](/i/fill.gif) |
"Nekar Xenos" <nek### [at] gmail com> wrote:
> On Sat, 12 Oct 2013 18:55:56 +0200, s.day <s.d### [at] uel ac uk> wrote:
>
> > My first real SSLT scene, took about 3 days to render.
> >
> > I am not completely happy with it yet, the wall either side of the steps
> > needs
> > to be wet near the bottom and the snow has a dodgy line through it in
> > several
> > places which I think is a mistake on my part with the texture.
> >
> > Also, the snow needs to look more melted where it meets the ground.
> >
> > Other than those 3 changes and another 3 days render time it is
> > finished..
> >
> > Sean
>
> Brilliant! It's so hot here in South Africa, I feel like I could eat that
> snow ;)
>
> I really like that door as well -how did you do it? Image maps or
> procedural?
>
> --
> -Nekar Xenos-
Hi Nekar,
I would look for some fresher stuff if I was you, it is only 9 degrees (C) here
in the UK so I have to say I am a bit jealous.
All the textures are procedural (except the leaves/tree which are XFrog so come
with image maps).
The door is (as Thomas spotted) pretty much a copy of the one in my Old Royal
IRTC train scene http://www.irtc.org/stills/2006-08-31.html just with a
different texture applied.
Sean
Post a reply to this message
|
![](/i/fill.gif) |