Hi all,
Here it is, version 3 of the production line. The piece is being bend twice
now, an elevator and the second bending device have been added.
To do list:
-texture on rollers (on request of Peter Hertel, but first I have to make
them rotate :-))
-pakking into boxes
-some preprocessing (drilling, sawing etc.)
-surroundings
have fun.
JWV
Post a reply to this message
Attachments:
Download 'Prodline_6.avi.dat' (276 KB)
|