Alain wrote:
> We have 750KV AC and 1000KV DC transmition lines all over the place.
Damn, you people are way front of me and my knowledge.
> Hydroquebec pioneered the 750KV lines with Churchill Falls and the Manic
> complex. It's pioneering 1000000 DC transmition with the Bay James. Why
> do you think that they invested several $1000000's a year for over 20
> years on that technology?
DC transmission? Possibly because DC is more tolerant to ripples, if it
gets hacked back to AC after all.
--
Eero "Aero" Ahonen
http://www.zbxt.net
aer### [at] removethiszbxtnetinvalid
Post a reply to this message
|