|
|
Peter Popov wrote:
>
> [...]
>
> If you are unsure what values to use, start with something like
> evaluate 5, 1.2, 0.95.
> ^^^^^^^^^^^^^
>
> How is 5 a minimum and 1.2 an over-estimation?
>
The second parameter is an overestimation *factor*, you are right that the
docs are not very clear about that.
Christoph
--
POV-Ray tutorials, IsoWood include,
TransSkin and more: http://www.tu-bs.de/~y0013390/
Last updated 03 Aug. 2002 _____./\/^>_*_<^\/\.______
Post a reply to this message
|
|