POV-Ray : Newsgroups : povray.binaries.images : [WIP] Golden Gate Bridge Server Time
6 Nov 2024 08:18:49 EST (-0500)
  [WIP] Golden Gate Bridge (Message 1 to 4 of 4)  
From: scott
Subject: [WIP] Golden Gate Bridge
Date: 21 Feb 2005 15:37:12
Message: <421a4678@news.povray.org>
I have been thinking about this for a while now, but only recently had time 
to start working on it.

I got the main dimensions of the bridge from their website.

http://www.goldengatebridge.org/research/factsGGBDesign.html

The land is from http://seamless.usgs.gov/ but it doesn't look quite right 
yet, I have to tweak the data and of course add some textures and trees and 
stuff.

I was just working on the cables this afternoon, they are so narrow compared 
to the size of the bridge they don't show up unless you use really high AA 
settings...

Next on my list is to use all the photos from the website to model the 
bridge and towers in more detail.

Scott


Post a reply to this message


Attachments:
Download 'ggb1.jpg' (54 KB)

Preview of image 'ggb1.jpg'
ggb1.jpg


 

From: scott
Subject: Re: [WIP] Golden Gate Bridge
Date: 23 Feb 2005 15:34:19
Message: <421ce8cb@news.povray.org>
Have done a few updates and changed the lighting/land texture...


Post a reply to this message


Attachments:
Download 'comp.jpg' (62 KB)

Preview of image 'comp.jpg'
comp.jpg


 

From: Dave Matthews
Subject: Re: [WIP] Golden Gate Bridge
Date: 23 Feb 2005 18:00:00
Message: <web.421d0ab3b61e46928c7259570@news.povray.org>
"scott" <spa### [at] spamcom> wrote:
> Have done a few updates and changed the lighting/land texture...

That's starting to look pretty good!  For the upper cable, are you using a
sphere_sweep, or lots of spheres, or what?

Dave Matthews


Post a reply to this message

From: scott
Subject: Re: [WIP] Golden Gate Bridge
Date: 24 Feb 2005 04:02:13
Message: <421d9815$1@news.povray.org>
Dave Matthews wrote:
> "scott" <spa### [at] spamcom> wrote:
>> Have done a few updates and changed the lighting/land texture...
>
> That's starting to look pretty good!  For the upper cable, are you
> using a sphere_sweep, or lots of spheres, or what?

Six separate sphere sweeps for the big fat cables.  The spheres in the
sphere sweep are placed every 25 metres, and the span is about 1200 metres.
I haven't got them aligned quite right yet at the tower top, because there
is some fancy wheel thing that they go over (and obviously IRL it is just
two continuous cables).


Post a reply to this message

Copyright 2003-2023 Persistence of Vision Raytracer Pty. Ltd.